› |
address |
Your contact |
|
› |
project controller |
› |
engineering |
Our digestate narema treatment system is set up and pre-installed on-site in a container-type construction. During day-to-day operation, its low maintenance requirements set it apart for you as an operator.
Components
By using established components, the nareCon 1000 can be pre-installed and checked in the factory. Therefore, lengthy on-site assembly is avoided.
Installation
The nareCon 1000 is supplied in containers and therefore requires little space on your premises. As the waste heat from your biogas plant's engine plays a key role in the narema separation process, the installation must be right next to the CHP turbine house (preferably on strip foundations).
Overheads
Our digestate treatment system operates automatically, is reliable because tried-and-tested components are utilised and requires little maintenance.
As part of the services we offer, we would be delighted to explain the support we give and the steps required to set up the nareCon 1000 on your premises.

